User Rating 0.0
Total Usage 2 times
Is this tool helpful?

Your feedback helps us improve.

About

Precise concrete estimation is the difference between a successful pour and a costly disaster. Whether pouring a foundation slab, setting fence posts, or casting columns, running out of material mid-job creates structural weaknesses known as cold joints. Conversely, over-ordering results in wasted budget and disposal fees. This tool addresses these logistical constraints by converting geometric volume into purchasing units.

For DIY projects using pre-mix bags, accuracy depends on the specific yield per bag, which varies by weight and manufacturer. For site-mixed concrete, the structural integrity relies on the water-cement ratio and the proportion of aggregates. This calculator handles both scenarios, providing data for standard compression strengths.

concrete calculator cement mix slab volume construction estimation mortar mix

Formulas

The volume V is calculated based on geometry. For rectangular slabs:

V = L × W × H

For cylindrical columns or post holes:

V = π × r2 × H

To determine the number of pre-mix bags required:

Nbags = VtotalYbag

Where Ybag is the yield volume per specific bag weight.

Reference Data

Material / Bag SizeApprox. Density / YieldTypical Use Case
Standard Concrete (Cured)2400 kg/m3General construction density
Cement (Loose)1505 kg/m3Binding agent
Sand (Dry)1600 kg/m3Fine aggregate
Gravel / Aggregate2400 kg/m3Coarse aggregate
80lb Pre-Mix Bag 0.60 ft3Slabs, walkways
60lb Pre-Mix Bag 0.45 ft3Post holes, small repairs
Mix Ratio 1:2:33000 PSIStandard floors, patios
Mix Ratio 1:3:52000 PSIFootings, mass concrete

Frequently Asked Questions

Calculating exactly is risky due to uneven subgrades, spillage, and formwork deflection. Professional estimators typically add a safety margin of 5% to 10% to the total volume to account for these variables.
As a general rule, if your project requires more than 1 cubic yard (approx. 45-50 bags of 80lb), ordering a ready-mix truck becomes more cost-effective and labor-efficient. Mixing by hand for large volumes ensures inconsistency and fatigue.
In traditional site mixing, ratios like 1:2:3 (1 part cement, 2 parts sand, 3 parts gravel) refer to volume. This is often measured using a shovel or a bucket. However, batch plants measure by weight for precision.
Water demand varies based on the moisture content of your sand and aggregate. You should add water gradually until a workable consistency (slump) is achieved. Too much water drastically reduces the final compressive strength.